新春快乐!
SteveWatch+ 1.0(44) 更新日志
1. 剧集详情页布局微调(测试)
• 对剧集详情页进行了微调,现处于测试阶段,期待提供更好的视觉效果和体验。
2. 选集展示更多功能
• 选集现在可以点击以展示更多内容,让浏览更加方便。
3. 播放器手势操作支持
• 增加了手势操作支持,提升播放体验:
• 长按切换至 2 倍速播放
• 左侧上滑调整亮度
• 右侧上滑调整音量
• 左右单击快进 10 秒
4. 部分 CMS 源支持选集和搜索
• 现在部分 CMS 源已支持选集和搜索功能,内容查找更加便捷。
5. 长按播放选集预览优化
• 优化了长按播放时的选集预览,带来更流畅的操作体验。
6. 新增部分 CMS 添加支持
• 现在可以添加部分 CMS,进一步丰富内容源。
7. 剧集排列问题修复
• 解决了剧集排列问题,让剧集显示更精准、顺畅。
更新后,祝您在新的一年里享受更好的观影体验!
Happy Chinese New Year!
SteveWatch+ 1.0 (44) Release Notes
1. Minor Layout Adjustments on Episode Detail Page (Testing)
• Minor adjustments have been made to the episode detail page, currently in testing to provide a better visual and user experience.
2. Show More Option for Episodes
• You can now click to show more episodes, making browsing more convenient.
3. Gesture Control in Player
• Added gesture support for the player to enhance playback experience:
• Long press to toggle 2x playback speed
• Swipe up on the left to adjust brightness
• Swipe up on the right to adjust volume
• Single tap on the left or right to skip 10 seconds
4. Support for Episode Selection and Search in Some CMS Sources
• Now some CMS sources support episode selection and search functionality, making it easier to find content.
5. Optimized Long Press to Preview Episode Playback
• Optimized the long press to preview episode playback, providing a smoother operation experience.
6. Added Support for Adding Some CMS
• You can now add some CMS, further expanding the content sources.
7. Fixed Episode Ordering Issue
• Fixed the issue with episode ordering, ensuring more accurate and smoother episode displays.
Update now to enjoy an enhanced viewing experience in the new year!
SteveWatch+ 1.0(44) 更新日志
1. 剧集详情页布局微调(测试)
• 对剧集详情页进行了微调,现处于测试阶段,期待提供更好的视觉效果和体验。
2. 选集展示更多功能
• 选集现在可以点击以展示更多内容,让浏览更加方便。
3. 播放器手势操作支持
• 增加了手势操作支持,提升播放体验:
• 长按切换至 2 倍速播放
• 左侧上滑调整亮度
• 右侧上滑调整音量
• 左右单击快进 10 秒
4. 部分 CMS 源支持选集和搜索
• 现在部分 CMS 源已支持选集和搜索功能,内容查找更加便捷。
5. 长按播放选集预览优化
• 优化了长按播放时的选集预览,带来更流畅的操作体验。
6. 新增部分 CMS 添加支持
• 现在可以添加部分 CMS,进一步丰富内容源。
7. 剧集排列问题修复
• 解决了剧集排列问题,让剧集显示更精准、顺畅。
更新后,祝您在新的一年里享受更好的观影体验!
Happy Chinese New Year!
SteveWatch+ 1.0 (44) Release Notes
1. Minor Layout Adjustments on Episode Detail Page (Testing)
• Minor adjustments have been made to the episode detail page, currently in testing to provide a better visual and user experience.
2. Show More Option for Episodes
• You can now click to show more episodes, making browsing more convenient.
3. Gesture Control in Player
• Added gesture support for the player to enhance playback experience:
• Long press to toggle 2x playback speed
• Swipe up on the left to adjust brightness
• Swipe up on the right to adjust volume
• Single tap on the left or right to skip 10 seconds
4. Support for Episode Selection and Search in Some CMS Sources
• Now some CMS sources support episode selection and search functionality, making it easier to find content.
5. Optimized Long Press to Preview Episode Playback
• Optimized the long press to preview episode playback, providing a smoother operation experience.
6. Added Support for Adding Some CMS
• You can now add some CMS, further expanding the content sources.
7. Fixed Episode Ordering Issue
• Fixed the issue with episode ordering, ensuring more accurate and smoother episode displays.
Update now to enjoy an enhanced viewing experience in the new year!
春节快乐!
SteveWatch+ 1.0(43)更新日志
1. 详情页 UI 微改
• 对详情页的用户界面进行了细微调整,提升了整体的视觉效果和可用性。
2. 修复导入 JSON 文件失败的 BUG
• 解决了导入 JSON 文件时出现的错误,现在可以顺利导入文件。
3. 添加用户协议页面
• 新增用户协议页面,用户只需同意一次,确保法律合规。
4. 部分 CMS 站点的支持
• 优化了对部分 CMS 站点的支持,感谢大哥的指导。
5. 详情页分类 tag 添加
• 在详情页中新增了分类标签,使得内容浏览更加清晰和有序。
6. 演员列表更多界面 BUG 修复
• 修复了演员列表中的“更多”按钮显示问题,确保正常展示所有演员信息。
7. 关于界面添加更多信息
• 在关于界面中添加了更多的应用信息,方便用户了解版本和支持信息。
8. 更换新的 TMDB API(测试)
• 新的 TMDB API 已经替换,进行测试中,未来将提供更加丰富的电影和剧集数据。
9. TVShow 页面 BUG 修复
• 修复了 TVShow 页面中一些已知问题,提升了页面稳定性和流畅度。
10. TVShow 页面添加阈值缓存
• 为 TVShow 页面添加了阈值缓存,现在页面不会频繁刷新,提升了用户体验。
新春更新,让我们一起迎接更流畅、更智能的 SteveWatch+!
SteveWatch+ 1.0(43)更新日志
1. 详情页 UI 微改
• 对详情页的用户界面进行了细微调整,提升了整体的视觉效果和可用性。
2. 修复导入 JSON 文件失败的 BUG
• 解决了导入 JSON 文件时出现的错误,现在可以顺利导入文件。
3. 添加用户协议页面
• 新增用户协议页面,用户只需同意一次,确保法律合规。
4. 部分 CMS 站点的支持
• 优化了对部分 CMS 站点的支持,感谢大哥的指导。
5. 详情页分类 tag 添加
• 在详情页中新增了分类标签,使得内容浏览更加清晰和有序。
6. 演员列表更多界面 BUG 修复
• 修复了演员列表中的“更多”按钮显示问题,确保正常展示所有演员信息。
7. 关于界面添加更多信息
• 在关于界面中添加了更多的应用信息,方便用户了解版本和支持信息。
8. 更换新的 TMDB API(测试)
• 新的 TMDB API 已经替换,进行测试中,未来将提供更加丰富的电影和剧集数据。
9. TVShow 页面 BUG 修复
• 修复了 TVShow 页面中一些已知问题,提升了页面稳定性和流畅度。
10. TVShow 页面添加阈值缓存
• 为 TVShow 页面添加了阈值缓存,现在页面不会频繁刷新,提升了用户体验。
新春更新,让我们一起迎接更流畅、更智能的 SteveWatch+!
1. 姓氏读音更新
• 扩展了对多音姓氏的支持,并修复了一些拼音错误,进一步提升拼音准确性。
2. UI 动画优化
• 全面改进用户界面动画,为您带来更加流畅自然的使用体验。
3. 拼音修正
• 修复了多处拼音读音错误,确保拼音显示更加精准。
4. 导入黄页联系人
• 新增支持导入常用的中国黄页联系人头像,优化 iOS 通话和信息交互体验。
立即更新,体验更加智能与贴心的功能!
StevePinyin,从一款简单的通讯录拼音助手,成长为一款功能强大的通讯录管理神器,一路走来,我们用心倾听用户的声音!
初衷:为您的通讯录添加拼音
StevePinyin 最初的功能很简单:为通讯录联系人添加拼音,让查找联系人更加方便快捷。
不断进化:倾听用户,持续优化
在用户的建议下,我们不断增加功能,使得 App 越来越好用:
• 中国黄页:快捷导入黄页数据,便捷查找各类服务信息。
• T9 搜索:支持 T9 搜索,快速定位联系人,效率更高。
用户反馈的重要性
开发 App 只是第一步,真正让一款 App 成功的是用户的反馈和支持。从功能升级到 bug 修复,我们始终以用户体验为核心,不断改进,让 StevePinyin 成为您爱用、想用的工具!
📥 下载 StevePinyin,一起见证它的成长!